Highlighted Case

Thermomodernization of the building of the Local Government Nursery in Chmielnik.
Post date: 28 Mar 2019
Type: Case

Location:  Rue Vanpé 50, 1190 Forest, BrusselsClient:   Forest CPASConstruction Budget: 1471 €/m² - excl.VATGross Area: 1017 m²   The project embraces the thorough renovation a building from the 1930s. The CPAS of Forest Municipality of Brussels brought together its various services there in 2005.  To preserve the façade (exterior walls, windows and doors), the walls have been insulated from the inside by 20 cm of cellulose.
Post date: 21 Mar 2019
Type: Case

Programme: Sports Equipment   /  Location: Rue du champ de l'Eglise 73 - 1020 Brussels Client: City of Brussels Refurbishment Budget: (technical installations + energy envelope):  € 3,49 M excl.VAT Area: 6088 m² net / 8778 m² brut  
Post date: 21 Mar 2019
Type: Case

The Oxygen Office Building project, ideally located in the city of Brussels between the Royal Park and the Squares District, and between the Arts-Loi and Maelbeek metro stations, aimed the construction of a new low footprint office building replacing one that had become obsolete.   Thanks to a staggering of the roofs, the new building joins the different reference heights of neighboring buildings. The roof also serves of support for a green roof as well as for a high yield photovoltaic production (112m² - 22.5 kWp).
Post date: 5 Mar 2019
Type: Case

Building data: Location: Pfuhler Str. 4+6 / Pfuhler Str. 12+14 Neu-Ulm, Bavaria, Germany Building Owner: NUWOG Neu-Ulm Housing Company Architects: Werner Sobek, Stuttgart / o5 Architects bda, raab hafke lang, Frankfurt Main HVAC planer: Werner Sobek Green Technology, Stuttgart / EGS-Plan, Engenierung company for energy- building- and solar technology mbH, Stuttgart
Post date: 1 Mar 2019
Type: Case

The Sans-Souci project is remarkable for its scope and for its scale of intervention: the plot is about 300 meters long and 100 meters wide, which is equivalent to the area of 3 classical-small-size city blocks of the Brussels.  
Post date: 17 Jan 2019
Type: Case

Being heavily involved in passive constructions, we wanted to create a thoughtful and sustainable building. We equipped our control house with a complete EnOcean wireless home automation system. This innovative technology works without any battery or wiring. The energy recovered during the manipulation is enough to emit a radio signal, which makes it possible, for example, to turn on the light.
Post date: 17 Jan 2019
Type: Case

Project type : New Construction   Building Type : Collective housing < 50m Number of Dwelling : 11 Dwelling Net Floor Area : 950 m2 Climate zone : [Cfb] Marine Mild Winter, warm summer, no dry season. Construction cost : 1 450 000 € The project is a social experiment that tackles the notion of "experimental" so that it can fit into a reality that is understandable and accessible to all the actors of the project, from conception to completion. realization and all his life.  
Post date: 15 Jan 2019
Type: Case

The media library of Saint-Joseph (Reunion) questions the identity of the contemporary architecture of Reunion, that of the Sud Sauvage more precisely. It refers to images, block of basalt, fagot of vetyver, geko, kalbanon but especially for uses, taking again the progressiveness of the sequences of traditional entries, creating a progression between the public space and that of the intimate one.  
Post date: 15 Jan 2019
Type: Case

Located in the Cité universitaire de Paris, the Maison de l'Ile de France is the first eco-campus in the capital. The project is exemplary and implements a high energy performance strategy to meet ZEN objectives (Zero Energy, Zero Carbon, Zero Nuclear Waste) and thus anticipate the thermal regulations of 2020.  
Post date: 14 Jan 2019
Type: Case