Zetland Road: Deep Retrofit of Two Victorian semi-detached houses from 1894, Manchester UK

Deep ecological retrofit of two Victorian townhouses Chorlton, Manchester Completed: Autumn/winter 2018 Standard: Enerphit Plus -£43 per year (estimated total energy costs)   This Victorian property in the centre of Chorlton had spent many years...

The Albero: Construction 21 Case Study

Albero project of rehabilitation, modernization and requalification of the architectural envelope is part of this urban dynamic as much by its singular aestheticism as by the proposed living environment wanted healthy and pleasant to live for future...

Zetland Road: Deep Retrofit of Two Victorian semi-detached houses from 1894, Manchester UK

Deep ecological retrofit of two Victorian townhouses Chorlton, Manchester Completed: Autumn/winter 2018 Standard: Enerphit Plus -£43 per year (estimated total energy costs)   This Victorian property in the centre of Chorlton had spent many...

The Albero: Construction 21 Case Study

Albero project of rehabilitation, modernization and requalification of the architectural envelope is part of this urban dynamic as much by its singular aestheticism as by the proposed living environment wanted healthy and pleasant to live...

Case study with integration of BIPV: Akademie Mont-Cenis (Herne, Germany)

A more than 12,000 m² glass envelope covers all of the buildings in this further training academy. PV systems were integrated into the roof surfaces and the south-west surfaces of the glass envelope on the sides. The almost 3200 PV modules...

World's tallest Passive House: high-rise Bolueta (Bilbao-Spain)

The developers and architects of this project have set very high goals. With the Bolueta building, they wanted to set a new Passive House record and at the same time ensure the quality of the building through certification. Bolueta in the...

CPAS Vanpe “Very Low Energy” Heritage / Office Building Renovation - Brussels

Location:  Rue Vanpé 50, 1190 Forest, BrusselsClient:   Forest CPASConstruction Budget: 1471 €/m² - excl.VATGross Area: 1017 m²   The project embraces the thorough...

BAINS DE LAEKEN - Swimming pools complex Low-Energy Renovation - Brussels

Programme: Sports Equipment   /  Location: Rue du champ de l'Eglise 73 - 1020 Brussels Client: City of Brussels Refurbishment Budget: (technical installations + energy envelope):  € 3,49 M excl.VAT Area: 6088 m² net / 8778 m² brut   The “...

OXIGEN OFFICE BUILDING

The Oxygen Office Building project, ideally located in the city of Brussels between the Royal Park and the Squares District, and between the Arts-Loi and Maelbeek metro stations, aimed the construction of a new low footprint office...

Sans-Souci project, Brussels, Belgium

The Sans-Souci project is remarkable for its scope and for its scale of intervention: the plot is about 300 meters long and 100 meters wide, which is equivalent to the area of 3 classical-small-size city blocks of the Brussels.   The...