French

The Commission is in the process of updating some of the content on this website in light of the withdrawal of the United Kingdom from the European Union. If the site contains content that does not yet reflect the withdrawal of the United Kingdom, it is unintentional and will be addressed.

The project belongs to a larger urban intervention with the new Grand Parc in Bordeaux, with green area and public spaces, and it occupies a central place in redefining the neighbourhood. It also has an identity vocation because it constitutes a visual catch from the perspective created by the plot where it is located. The volume, simple but slightly decomposed, expresses the public and private use of the building and highlights a forecourt that opens on the urban project of the Grand Parc.  
Post date: 1 Set 2020
Type: Caso

Le vendredi 5 juin, la Plateforme des Acteurs pour le Réemploi d’Eléments de Construction à Bruxelles a rencontré Emmanuel Mossay, expert en économie circulaire chez Ecores, Groupe One et à l’Institut Eco-conseil et également, professeur-invité en économie régénérative dans plusieurs universités (ULB, UCLouvain, ULiège, UNamur)  et Hautes Ecoles (Henallux, ICHEC, EPHEC) et administrateur de la
Post date: 27 Ago 2020
Type: News

Le secteur du bâtiment est le principal producteur de gaz à effet de serre et le deuxième plus grand émetteur de substances polluantes dans l’air de la Région de Bruxelles-Capitale (RBC).
Post date: 26 Ago 2020
Type: News

Propel by MIPIM  | MIPIM Urban Forum  | MIPIM Awards  | Partner events    
Post date: 24 Ago 2020
Type: Evento

Called Sport'Co, the Beaucouzé sports complex (49) opened its doors in early March 2019. In many ways, this positive-energy public school illustrates the right balance between fundamental values and innovative ideas. While meeting the functional requirements of a structure dedicated to team sports, it is characterized by exemplary technical and economic performances:
Post date: 28 Lug 2020
Type: Caso

The scope of the project was to increase the office surface through a roof extension, having a surface of around 900 m2, following sustainability and energy efficiency criteria.  
Post date: 17 Lug 2020
Type: Caso

Project type: New Construction Building Type: Equipment, forestry services Construction Year : 2018 Delivery year: 2018 Climate zone : [Cfc] Marine Cool Winter & summer- Mild with no dry season. Net Floor Area: 852 m2 Other Construction cost: 1 756 543 € Cost/m2: 2 062 €/m2   Contractor: IBGE
Post date: 14 Lug 2020
Type: Caso

L’audit réemploi constitue une étape clé dans l'optimisation de la quantité de matériaux de construction effectivement réemployés par le secteur de la construction. En vue de cet objectif général, les inventaires réemploi peuvent servir à différentes fins :  
Post date: 8 Lug 2020
Type: Publication

This hard-stone elementary school is located in Mulhouse in the Alsace region (north-eastern France), near the border with Germany. It is a listed building, since it was built in XXVIII sec as a spinning factory at a time which Mulhouse had an active textile industry and became a school in 1870. It has recently been retrofitted with a project balanced between low energy consumption and heritage preservation, with the availability of a constraint budget.  
Post date: 6 Lug 2020
Type: Caso

Transition Workshop 2020 Roadmaps for resilient decarbonizing cities 13 – 24 Juillet 2020, Genève  
Post date: 3 Lug 2020
Type: Evento