Very low energy buildings

The Commission is in the process of updating some of the content on this website in light of the withdrawal of the United Kingdom from the European Union. If the site contains content that does not yet reflect the withdrawal of the United Kingdom, it is unintentional and will be addressed.

ECOSM in figure : Total surface area of the building : 1511 m2 Cost of construction : 2.1 millions euros or 1390 €/m2 42 photovoltaic membranes : 17.14 kWc LED lighting : 786 Watts Heat Pumps : 4 (inside the eco-sphere) 243 Wirecom technologies electronic cards 182 sensors : temperature, hygrometry, luminosity, rain, wind, pressure 312 actuators Construction and insulation of walls :
Post date: 15 Giu 2009
Type: Caso

The CHANGE project helps SMEs optimise their energy use by developing a European network of intelligent energy advisors at Chambers of Commerce and Industry (CCIs) and by kick-starting/enhancing concrete assistance to SMEs.
Post date: 15 Giu 2009
Type: Caso

Post date: 14 Giu 2009
Type: Link

Post date: 14 Giu 2009
Type: Link

Goals:  The Passive House Platform wants to stimulate the construction/realization of low-energy buildings based on the Passive House concept.  On the one hand, the platform wants to bring together organisations that have an inclination towards this subject  and would like to support them in the development of Passive House technologies. On the other hand, the PHP wants to provide as much information as possible to all interested parties.
Post date: 14 Giu 2009
Type: Link

Post date: 14 Giu 2009
Type: Link

Array
Post date: 14 Giu 2009
Type: Evento

In the framework of the project a website on energy efficient buildings was created. The website contains information on technology, materials, economics and case studies.
Post date: 13 Giu 2009
Type: Caso

The goal of the project is to construct a passive church.
Post date: 13 Giu 2009
Type: Caso

Project goal was to design and build a single-family pasive house to promote energy efficiency in buildings and demonstrate technical and economical fasibility.
Post date: 13 Giu 2009
Type: Caso