The administration building of the “Dachverbandes der öster. Sozialversicherung”in Wien, built at the end of the Seventies, has recently undergone a general renovation.  
Post date: 15 paź 2020
Type: Sprawa

Innsbruck is one of the pilot cities of the FP7 project SINFONIA, and selected its eastern district to demonstrate the large scale implementation of energy efficient measures, with the objective of achieving on average 40 – 50% primary energy savings in the demo sites and to increase at least by 30% the share of renewables in the district’s energy mix.  
Post date: 6 paź 2020
Type: Sprawa

The building is an office of the company Thales Communications & Security in Bordeaux Mérignac completed in 2017. Designed by the architect Jean-Philippe Le Covec to improve the performance and well-being of its occupants, the campus is composed by nine buildings in the heart of a landscaped park. The architect imagined at the entrance of the site, an entire building dedicated to the reception and services with a restaurant, a business center, a space dedicated to the works council, a conciergerie , a showroom and many meeting rooms.
Post date: 25 wrz 2020
Type: Sprawa

The building, a residential construction designed by DMDV Arquitectos and built in 2020, represents an exemplary nZEB with that reached also the certification of Passivhaus Plus.  
Post date: 23 wrz 2020
Type: Sprawa

In the district of Statz in Mühlbachl, the local social housing agency implemented a residential project with three energy efficient buildings with 26 apartments and an overall surface of around 1270 m2, that reached the level klimaaktiv gold, the highest one according to the local energy standard.  
Post date: 9 wrz 2020
Type: Sprawa

The project belongs to a larger urban intervention with the new Grand Parc in Bordeaux, with green area and public spaces, and it occupies a central place in redefining the neighbourhood. It also has an identity vocation because it constitutes a visual catch from the perspective created by the plot where it is located. The volume, simple but slightly decomposed, expresses the public and private use of the building and highlights a forecourt that opens on the urban project of the Grand Parc.  
Post date: 1 wrz 2020
Type: Sprawa

The case is one of the demonstration sites where the technologies developed within the H2020 project BUILDHEAT have been installed. The building is a large multifamily house in a small quarter in the outskirts of Zaragoza. It has 53 dwellings of two main sizes (i.e. 85 m² and 55 m²) distributed in 5 staircases on 4 floors. The building was constructed in 1988, is owned by Zaragoza Vivienda, the social housing Agency of Zaragoza, and is used for sheltered housing.  
Post date: 20 sie 2020
Type: Sprawa

In this booklet, the results of the ZERO-PLUS are described emphasizing on the four case studies (UK, Italy, France, Cyprus), which all have now been constructed, commissioned and occupied. The case studies are in the monitoring phase where data about their energy environmental performance are being collected. These data will be used for the verification of the settlements’ performance.
Post date: 31 lip 2020
Type: Publication

The settlements are located in Cyprus, France, Italy and the UK and consist of different typologies of residential buildings. They are now occupied and a monitoring phase is ongoing to collect data on their energy and environmental performances and verify the ZERO-PLUS solutions.  
Post date: 31 lip 2020
Type: Aktualności

The building has been nominated for the BREEAM Energy award 2020 and it is a very ambitious construction in the city centre of Warsaw. The location was originally occupied by a block of flats of 10 floors built in 1960, that was demolished in 2017, in order to enable the construction of the new complex, more in line with the new needs of the Warsaw’s office market.  
Post date: 31 lip 2020
Type: Sprawa