none

The Commission is in the process of updating some of the content on this website in light of the withdrawal of the United Kingdom from the European Union. If the site contains content that does not yet reflect the withdrawal of the United Kingdom, it is unintentional and will be addressed.

The aim of the project and the associated construction measures is to repair the existing and restore the original condition.   The floor plans will be spatially and functionally separated, with the aim of consistently uncovering the core building from 1765 on all floors.  
Post date: 1 mar 2021
Type: Cas

  Architects: Space Popular Area:  235 m² Year:  2020 Photographs:  Mariela Apollonio Collaborating Architects: Estudio Alberto Burgos, Javier Cortina Maruenda City: Santa Bárbara Country: Spain The Brick Vault House is a prototype for suburban house construction that integrates industrialised construction methods with traditional craftsmanship in Valencia, Spain.  
Post date: 16 fév 2021
Type: Cas

Brinova Arena Karlskrona is a multi functional venue suitable for both larger events and smaller sports activities. It is built to PHI Low Energy Standard and was completed in 2019.   Parties involved:  
Post date: 9 fév 2021
Type: Cas

The multi-family house from the turn of the century was saved from demolition and extensively renovated. 6 apartments were set up with the latest technology and low energy consumption. The usable building fabric was carefully renovated and new elements added accordingly.   The comprehensive renovation enables comfort standards from the new building in the guise of an old building:  
Post date: 3 fév 2021
Type: Cas

Tieteellisiä, kritiikkiä kestäviä, ilmanvaihdon mitoitusperusteita ei ole.   Mitoituskäytäntö on perustunut paljolti kokemusperäiseen tietoon, jolloin ilmanvaihdon onnistuminen riippuu suunnittelijan kokemuksesta, kirjoittaa LVI-tekniikan emeritusprofessori Olli Seppänen FINVACin blogissaan: https://finvac.org/ilmanvaihdon-suunnittelulle-uudet-perusteet/
Post date: 25 jan 2021
Type: Cas

Before the refurbishment started, the local authority had around 1,500 bedsits right across the city. Known as zero-bed units, they were small – usually no more than 26 square metres – and as they aged, they became progressively less attractive to tenants.   Moreover, the more unattractive the location, the more ‘de-tenanted’ they became. So began a vicious cycle of vacancy, dilapidation and social deterioration.  
Post date: 8 jan 2021
Type: Cas

The Charles de Gaulle is a preschool and elementary school building located in Tourcoing, France.   It is a certified Passive House new build.   THERMAL ENVELOPE:   Exterior wall
Post date: 8 jan 2021
Type: Cas

Architecture firm Dialog has revealed plans for a cross-laminated timber higher education building in Canada, which it says will be the first of its kind.   The project, called A-Block Building Expansion, is a six-storey addition to an existing building at Centennial College of Applied Arts and Technology in Scarborough, which is about a 20-minute drive from downtown Toronto.  
Post date: 2 jan 2021
Type: Cas

The Kohlerhaus, a building dating back to the 14th century, was renovated to accommodate 10 apartments with the high standards of comfort and efficiency. The historical research carried out by the architect revealed the rich past of the building, that served as priest house, hotel or guest house. The retrofit of the building included external insulation the wall with reed mats, new replica windows and new building services (radiating heating and mechanical ventilation).  
Post date: 2 jan 2021
Type: Cas

  Pirkanmaalainen taloyhtiö teki energiaremontin ja säästi vuodessa huikean summan. Osasyynä oli uusi maalämmön ja poistoilman lämmöntalteenoton hybrijärjestelmä.   Pirkanmaalaiseen As. Oy. Peltolammin Veteraanitaloon oli tulossa iso tontin vuokrakorotus. Suurehko 72 huoneiston vuonna 1968 rakennettu taloyhtiö sijaitsee vuokratontilla.  
Post date: 16 déc 2020
Type: Cas